Walls-
____Double check dimensions of all walls (at the top of the wall)
____Check that all the corners are plumb
____Check that the middle braces of each wall are set back just a bit (about 1/2" in the middle)
____Check that the top of the walls are level
____Patch any holes or cracks
____Reinforce all joints that need reinforcing
____Make sure all turn buckles have room to move on the screw
____Put up string lines from corner to corner on every all with spacer blocks

Windows
____Double check that all windows are the proper size and in the proper location
____Make sure all windows are square and secured so they won't move
____Brace all openings 2' on Center
____ Make sure you have 4" holes in the bottom of each opening for pumping
____scab weak points as needed around openings

Accesses
____Hvac openings
     -6" fresh air (possibly 2)
     -4" dryer
     -2" for AC line
     -Oven Vent
____Plumbing
     -Hose bibs
     -Sprinkler Lines
     -Garage Sink
     -water inlet
     -Sewer drain
     -Geo thermal loops (two 2" per loop)
     -Whole house Vacuum system
____Electrical
     -Exterior Outlets
     -Exterior lights
     -Exterior Switches
     -Garage Switches
     -Breaker Box
     -Main meter
     -Specialty outlets
____Miscleneous
     -Extra Vents
     -Air exchanger
____Beam Pockets
____Floor Hangers or bolts
___


Advanced Construction
Concepts Inc.
Pour Check List